Introduction to the Two-Area System Model
In this simulation, we focus on a two-area system model that involves governors, turbines, and generator load models for both areas. The two areas are connected via power flow, and the main objective is to maintain frequency stability by ensuring that the frequency deviations in both areas are as close to zero as possible. The power exchange between the areas is dynamically controlled to accommodate changes in load conditions.
Objective: Maintaining Frequency Stability
The primary goal of this AGC system is to maintain a stable frequency in both Area 1 and Area 2. As the load conditions in each area change, the system adjusts the power flow to counteract frequency deviations. The challenge is to ensure that the frequency change in both areas is kept to a minimum, ideally zero, by appropriately regulating the load power flow.
The Controller: Fuzzy-Tuned PID Approach
Instead of using traditional integral controllers, a fuzzy-tuned PID controller is employed for controlling the frequency deviations (Δω1 and Δω2) in both areas. The fuzzy PID controller provides a more adaptive and efficient way of tuning the proportional, integral, and derivative parameters (KP, Ka, and KD) based on the system's dynamic behavior.
System Components and Data
The simulation model uses data for the governor, turbine, and generator load models in both areas. These values are based on real-world parameters and are essential for creating a realistic simulation environment. The transfer functions for the governor, turbine, and generator load models are incorporated into the system, ensuring that all the dynamics of power generation and frequency control are accurately represented.
Fuzzy PID Controller Design
The fuzzy-tuned PID controller works by receiving two key inputs: the area control error and its rate of change. These inputs are processed by the fuzzy logic controller, which adjusts the PID parameters—KP, Ka, and KD. These parameters are multiplied by the error signals, and the results are combined to generate control signals that drive the system toward maintaining zero frequency deviations.
The fuzzy logic system employs a set of predefined rules that help determine the appropriate values for KP, Ka, and KD based on the error and the rate of error. This approach makes the controller highly adaptive to changing system dynamics, ensuring more accurate frequency regulation.
Simulation Results: Load Changes and Frequency Control
To test the system’s performance, the simulation starts with a small load disturbance of 0.2 per unit. After 25 seconds, the frequency deviations in both areas (Δω1 and Δω2) are driven to zero, demonstrating the effectiveness of the fuzzy-tuned PID controller.
The simulation is then repeated with more significant load changes, such as a change from 2 per unit to 3 per unit. Despite the disturbances caused by these load variations, the fuzzy PID controller effectively manages the frequency deviations, bringing them back to zero after a brief period of fluctuation. This shows that the system can quickly stabilize, even under varying load conditions.
Conclusion: The Effectiveness of the Fuzzy-Tuned PID Controller
The MATLAB simulation demonstrates that the fuzzy-tuned PID controller provides an efficient and adaptive solution for Automatic Generation Control in a two-area power system. By continuously adjusting the PID parameters based on real-time error data, the fuzzy controller ensures that both areas maintain frequency stability. This approach offers a more reliable and flexible way to manage frequency deviations compared to traditional controllers.
As the power system continues to evolve with the introduction of renewable energy sources and more complex load profiles, the need for adaptive control systems like the fuzzy-tuned PID controller will only increase. This simulation highlights the potential of fuzzy logic in enhancing the stability and efficiency of modern power systems.