MATLAB Simulation of PSO Trained Neural Network MPPT for Solar PV system

MATLAB Simulation of PSO Trained Neural Network MPPT for Solar PV system


Overview of MPPT and Neural Networks

What is MPPT?

Maximum Power Point Tracking (MPPT) is a technique used to maximize the power output from a solar PV system. The goal is to adjust the operating point of the PV panel to ensure it operates at its maximum power point, regardless of changes in environmental conditions.

The Role of Neural Networks

Neural networks can predict and optimize the operating point of a PV system by learning from historical data. In our simulation, we use a neural network to predict the voltage at the maximum power point based on irradiation and temperature inputs.

Particle Swarm Optimization (PSO) and Neural Network Training

Understanding PSO

Particle Swarm Optimization (PSO) is a computational method inspired by the social behavior of birds flocking or fish schooling. It’s used to find optimal solutions by having a group of candidate solutions (particles) explore the solution space and converge towards the best solution.

Integrating PSO with Neural Networks

In this simulation, PSO is used to train a neural network. The weights and biases of the neural network are optimized using PSO to improve the accuracy of MPPT. This method involves:

  1. Initializing the Neural Network: Define the structure with input, hidden, and output layers.

  2. Training Data Preparation: Use irradiation and temperature as inputs, and voltage at maximum power point as the target output.

  3. Optimization: Use PSO to optimize the weights and biases of the neural network.

MATLAB Implementation

Modeling the PV Panel

First, we model the PV panel using standard equations. This involves setting up parameters such as current and voltage coefficients, and then using MATLAB to generate data for different temperatures and irradiation levels.

Data Collection

Using a MATLAB script, we simulate irradiation and temperature conditions to collect data on:

  • Current at Maximum Power Point

  • Voltage at Maximum Power Point

  • Power at Maximum Power Point

This data forms the basis for training the neural network.

Training the Neural Network

The training process involves:

  1. Setting Up the Neural Network: Define the network structure and initialize parameters.

  2. PSO Optimization: Execute PSO to update the weights and biases of the network.

  3. Error Calculation: Calculate the root mean square error to evaluate the performance of the trained network.

Simulation Results

After executing the PSO training, we analyze:

  • Cost Function Reduction: Observe how the cost function decreases with each iteration of PSO.

  • Final Neural Network: The trained neural network is used to predict the voltage at the maximum power point.